WATER PLANT ŽELIVKA

Drinking Water Supply System

Basic information

Dam built in 1975
Water Capacity 264 mil. m3
11 Water Pumps, each 1.6 MW
Treatment Capacity 7 700 l / sec 
Unique supply tunnel to Prague 

Control System

  DI DO AI AO
Dosage I 80 20 35 10
Dosage II 110 60 55 15
Filtering I 50 45 15  
Filtering II 190 100 25 -
Foltering III 190 100 25 -
Ozone Dosage 100 110 40 -
Operating Pumps 140 50 50 10
Power Supply Control 90 0 15  
Machine Room of F1 130 95 30 -
Raw Water Pumps 540 520 260 35
Summary 1620 1100 550 70

System Topics

IGSS32 SCADA system - 7 Dispatcher Sites
- 7 Information Sites
Redundant Cells Computers 
2 Data contrentrators  2
40 RTU - VME systems
- CANopen I/O system 
Distributed I/O modules 64

Filtering I - solution in I/O distribution

32 filters 3 300 l / sec
Each filter 24 I/Os 
Humidity 99 %
Local automatic with priority to manual control 
Distributed I/O modules for CAN bus 

Filtering I - solution in I/O distribution 

Drinking Water Supply Tunnel for  PRAGUE

Basic parameters

Length 51 km
Diameter 2.6 m
Radio network 
18 + 1 Stations - branching
- air venting
- auxiliary pumps
- shutt of chamber, ...